With the conventional concrete footing and blockwork foundations done, a cedar sill plate and drip flashing are placed on top and then the log stacking can commence. Each log has 4 runs of foam seal and 2 of butyl rubber. Any stud holes or electrical conduit holes get some silicone sealant too.
            		Dec
                    7
                    2007
                
                
            Sealing the log joints
Published by in Log House Construction
