May 9 2008

Window update

window-architrave-drying-after-undercoating.jpgSince our trial window in mid March we have procurred all the Western Red Cedar we needed to make the window and door linings, finalized the design and had it all machined at the local joinery shop, and the linings made up with mortice and tenon joints ready to install. We beefed up the width of the external architrave and have made the header the same depth as the log dovetail ends and with the same angle so it looks “designed”.

All the joinery has to have two coats of undercoat before installation and the log apertures routered ready for the architrave and header.